Image provided by: Texas A&M University
About The Battalion. (College Station, Tex.) 1893-current | View Entire Issue (Nov. 26, 1968)
nn«nsBBnBBniHB BAG TIME I Old Army fighters who worked in the cutting and stacking area grabbed a few winks just when ever the chance pre sented itself. Here a freshman just bombs out in the wide open spaces in the cutting area. SWEAT. TOIL. AND SLAVE LABOR Underclassmen of Company F-2 haul a second tier log into used to haul filler logs into place and to transport workers place Monday afternoon. These groups of workers were also between the stack levels. OF PRIDE AND THE WORK GOES ON The Aggie workers toiled through four nights in order to be able to finish the three-tier stack in time for the burning tonight. The working area was lighted by flood lights suspended on tele phone poles surrounding the area. MEN AND MACHINES A mixture of men and machines was used to speed up the work on the 1968 Aggie Bon fire. It seemed that the men were more reliable as the machines seemed to be giving someone constant trouble. time in talking about Credits Photos By: W.R. Wright Mike Wright